Presentation & Reports

These documents are saved as PDFs. You will need the free Abobe Reader to be able to read the documents. Download Abobe Reader


Buckinghamshire Infrastructure Study Phase 1 (Aylesbury Vale) - January 2008
Click the appropriate link below to download the PDF document.

PDF Executive Summary (January 2008) (3.75Mb)

PDF Final Report (January 2008) (6.23Mb)

PDF Final Report Technical Appendices (January 2008) (5.78Mb)


29.06.07: Aylesbury Vale Growth Agenda The Preferred Option
- The Southern Arc
Click the appropriate link below to download the PDF/Powerpoint document.

PDF Agenda (12Kb)

PDF Developer Summit 29 June 2007 Minutes (24Kb)

PDF Infrastructure Schedule (198Kb)

PDF Planning for Growth - An LDF Partnership (901Kb)

PDF Planning for Growth at Aylesbury (6Mb)


Building a healthy future for Aylesbury Vale
Click the link to download the PDF document.

PDF Building a healthy future for Aylesbury Vale (407Kb)

Aylesbury Vale Advantage